United States › Grid › Interconnection queues › North Carolina
OTHER · SOUTHEASTOther project PP00048, Onslow County
Other project PP00048, Onslow County is a 199 MW other request in interconnection study in the Southeast interconnection queue, in Onslow County, North Carolina, connecting to Duke Energy Progress.
- PlanningQueued Aug 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Mar 2030 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- PP00048
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Connection point (POI)
- Grants Creek Substation
- Location
- Onslow County, North Carolina
- Technology
- Other: 199 MW
- Total requested
- 199 MW
- Study phase
- Tender Provisional Study Agreement
- Queue status
- Active
- Entered queue
- 29 August 2025
- Proposed online date
- March 2030
Location
Marker shows the centre of Onslow County; the queue data does not give exact sites.
Power plants in North Carolina · Transmission lines in North Carolina
Other requests in Onslow County
- Battery storage project 977397, Onslow CountyBattery storage · 199 MW · in study
- Other project PP00049, Onslow CountyOther · 199 MW · in study
- Battery storage project 977359, Onslow CountyBattery storage · 199 MW · in study
- Solar project 4891, Onslow CountySolar · 12.8 MW · built
- Battery storage project 18124, Onslow CountyBattery storage · 11.0 MW · built
- Solar project 22333, Onslow CountySolar · 185 MW · withdrawn
- Solar project 20318, Onslow CountySolar · 80.0 MW · withdrawn
- Solar project 566356, Onslow CountySolar · 80.0 MW · withdrawn
- Solar project 957336, Onslow CountySolar · 74.9 MW · withdrawn
- Solar project 15650, Onslow CountySolar · 72.0 MW · withdrawn
- Battery storage project 44634, Onslow CountyBattery storage · 72.0 MW · withdrawn
- Solar project 15739, Onslow CountySolar · 72.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem