United States › Grid › Interconnection queues › Nebraska

OTHER · SPP

Other project GEN-2025-SR24, Washington County

Other project GEN-2025-SR24, Washington County is a 200 MW other request in interconnection study in the SPP interconnection queue, in Washington County, Nebraska, connecting to OPPD.

Queue statusIn planning
  1. PlanningQueued Jun 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Nov 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GEN-2025-SR24
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
OPPD
Connection point (POI)
Fort Calhoun 345kV Substation
Location
Washington County, Nebraska
Technology
Other: 200 MW
Total requested
200 MW
Service type
Energy only (ERIS)
Study phase
FACILITY STUDY STAGE
Queue status
Active
Entered queue
12 June 2025
Proposed online date
November 2028

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Nebraska · Transmission lines in Nebraska

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem