United States βΊ Grid βΊ Interconnection queues βΊ Nebraska
BATTERY STORAGE Β· SPPBattery storage project GEN-2019-072, Washington County
Battery storage project GEN-2019-072, Washington County is a 50.0 MW battery storage request withdrawn in the SPP interconnection queue, in Washington County, Nebraska, connecting to OPPD.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2019 (completed)
- Withdrawn / abandonedMay 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2019-072
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OPPD
- Connection point (POI)
- S1226 161 kV substation
- Location
- Washington County, Nebraska
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 24 May 2019
- Proposed online date
- December 2023
- Withdrawn
- May 2022
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Other requests in Washington County
- Solar project GEN-2020-078, Washington CountySolar Β· 100 MW Β· agreement signed
- Other project GEN-2025-SR24, Washington CountyOther Β· 200 MW Β· in study
- Battery storage project GEN-2018-025, Washington CountyBattery storage Β· 200 MW Β· suspended
- Nuclear project GEN-2004-002O, Washington CountyNuclear Β· 48.0 MW Β· built
- Battery storage project GEN-2018-090, Washington CountyBattery storage Β· 125 MW Β· withdrawn
- Nuclear project GEN-2007-030O, Washington CountyNuclear Β· 67.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem