United States βΊ Grid βΊ Interconnection queues βΊ Nebraska
NUCLEAR Β· SPPNuclear project GEN-2007-030O, Washington County
Nuclear project GEN-2007-030O, Washington County is a 67.0 MW nuclear request withdrawn in the SPP interconnection queue, in Washington County, Nebraska, connecting to OPPD.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2007 (completed)
- Withdrawn / abandonedApr 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2007-030O
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OPPD
- Location
- Washington County, Nebraska
- Technology
- Nuclear: 67.0 MW
- Total requested
- 67.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 10 July 2007
- Proposed online date
- November 2012
- Withdrawn
- April 2009
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Other requests in Washington County
- Solar project GEN-2020-078, Washington CountySolar Β· 100 MW Β· agreement signed
- Other project GEN-2025-SR24, Washington CountyOther Β· 200 MW Β· in study
- Battery storage project GEN-2018-025, Washington CountyBattery storage Β· 200 MW Β· suspended
- Nuclear project GEN-2004-002O, Washington CountyNuclear Β· 48.0 MW Β· built
- Battery storage project GEN-2018-090, Washington CountyBattery storage Β· 125 MW Β· withdrawn
- Battery storage project GEN-2019-072, Washington CountyBattery storage Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem