OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 26

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 26 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Avets
Battery storage
137 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Capetown Hybrid
Onshore wind
135 MWWithdrawn / abandoned Humboldt, CACAISO May 2016target 2022
Sienna
Solar + storage
133 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2015target 2018
Whitehorse Mountain Wind Power Plant
Onshore wind
132 MWWithdrawn / abandoned Siskiyou, CACAISO Nov 2011target 2016
Contra Costa Generating Station Expansion
Gas
131 MWWithdrawn / abandoned Contra Costa, CACAISO Jul 2009target 2017
Ramos
Gas
131 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Palmdale Energy
Gas
130 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2015target 2022
Milagro Wind
Onshore wind
130 MWWithdrawn / abandoned San Diego, CACAISO May 2008target 2011
Cassius Storage
Battery storage
130 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Dog Creek Hybrid
Battery storage
129 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Mensa
Battery storage
128 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Solano Wind Project - Phase 3 (115KV)
Onshore wind
128 MWWithdrawn / abandoned Solano, CACAISO Jun 2006target 2011
Lowlands P3
Gas
127 MWWithdrawn / abandoned Madera, CACAISO Nov 2004target 2007
Tungsten BESS
Battery storage
126 MWWithdrawn / abandoned San Bernardino, CACAISO Mar 2023target 2026
Mayacmas Wind Power
Onshore wind
126 MWWithdrawn / abandoned Mendocino, CACAISO Feb 2010target 2013
Eastside
Solar + storage
124 MWWithdrawn / abandoned Merced, CACAISO Apr 2019target 2023
Bonita Batería
Battery storage
124 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Bonita Batería 2
Battery storage
124 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Red Diamond Solar
Solar + storage
124 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2021target 2028
Calcite Solar 1
Solar + storage
124 MWWithdrawn / abandoned San Bernardino, CACAISO May 2016target 2021
Pronghorn Energy Storage
Battery storage
123 MWWithdrawn / abandoned Los Angeles, CACAISO Jun 2022target 2026
Rancho Fresno Storage Farm
Battery storage
122 MWWithdrawn / abandoned Fresno, CACAISO May 2016target 2021
Normandy
Solar + storage
122 MWWithdrawn / abandoned Kings, CACAISO Apr 2021target 2024
Cook Ranch
Solar + storage
121 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Great Valley Solar 2
Solar
120 MWWithdrawn / abandoned Tulare, CACAISO Apr 2012target 2015
Highline Solar Energy Center
Solar + storage
120 MWWithdrawn / abandoned Kern, CACAISO Apr 2018target 2021
Sidewinder Solar
Solar
120 MWWithdrawn / abandoned Riverside, CACAISO May 2016target 2020
Little Lake South Wind Farm
Onshore wind
120 MWWithdrawn / abandoned Kern, CACAISO Jul 2007target 2010
Great Valley Solar
Solar
120 MWWithdrawn / abandoned Tulare, CACAISO Mar 2011target 2013
Windstar I
Onshore wind
120 MWWithdrawn / abandoned Kern, CACAISO Dec 2005target 2009
Kearny Hybrid Power
Solar + storage
120 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2019
Ord Mountain
Solar + storage
120 MWWithdrawn / abandoned San Bernardino, CACAISO Feb 2010target 2022
American Kings 2
Solar
120 MWWithdrawn / abandoned Kings, CACAISO Apr 2015target 2020
Laurel Mountain Wind Farm
Onshore wind
120 MWWithdrawn / abandoned Kern, CACAISO Jul 2007target 2010
GV Solar 3
Solar
120 MWWithdrawn / abandoned Tulare, CACAISO Apr 2013target 2017
Grand Ave - Battery System
Battery storage
118 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2018
Solstice Sun Energy Center
Solar + storage
118 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Adame 1
Solar
118 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2014
Eastshore Energy Facility Project
Gas
118 MWWithdrawn / abandoned Alameda, CACAISO Nov 2004target 2009
Birch Street - Battery System
Battery storage
118 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2018
Cuyapaipe Wind Power Project
Onshore wind
117 MWWithdrawn / abandoned San Diego, CACAISO Feb 2004target 2007
Rocklin Peaker
Gas
117 MWWithdrawn / abandoned Placer, CACAISO Dec 2004target 2008
DGC Kelso Re 115.5
Gas
116 MWWithdrawn / abandoned Alameda, CACAISO May 2008target 2012
Ukiah Energy Center
Gas
115 MWWithdrawn / abandoned Mendocino, CACAISO Dec 2007target 2012
Meadow Ridge Solar And Battery
Solar + storage
114 MWWithdrawn / abandoned Shasta, CACAISO Apr 2021target 2034
Sequan
Battery storage
113 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Sodis Storage
Battery storage
112 MWWithdrawn / abandoned Stanislaus, CACAISO Apr 2021target 2024
Exchequer
Hydro
112 MWWithdrawn / abandoned Mariposa, CACAISO May 2017target 2019
Tyre
Solar + storage
111 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2019target 2022
Westside Renewal PV Project
Solar
110 MWWithdrawn / abandoned Kings, CACAISO Mar 2011target 2014
Page 26 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)