United States β€Ί Grid β€Ί Interconnection queues β€Ί California

ONSHORE WIND Β· CAISO

Milagro Wind

Milagro Wind is a 130 MW onshore wind request withdrawn in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
406
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Boulevard Substation
Location
San Diego County, California
Technology
Wind: 130 MW
Total requested
130 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 May 2008
Proposed online date
June 2011
Withdrawn
November 2008

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in San Diego County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem