🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

GAS · CAISO

Eastshore Energy Facility Project

Eastshore Energy Facility Project is a 118 MW gas request withdrawn in the CAISO interconnection queue, in Alameda County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2004 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
40
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Eastshore Substation
Location
Alameda County, California
Technology
Gas: 118 MW
Total requested
118 MW
Study phase
Executed
Queue status
Withdrawn
Entered queue
11 November 2004
Proposed online date
October 2009

Location

Marker shows the centre of Alameda County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Alameda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem