United States β€Ί Grid β€Ί Interconnection queues β€Ί California

ONSHORE WIND Β· CAISO

Windstar I

Windstar I is a 120 MW onshore wind request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2005 (completed)
  2. Withdrawn / abandonedMar 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
85
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Segment 3 230 Collector Loop Tehachapi
Location
Kern County, California
Technology
Wind: 120 MW
Total requested
120 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
28 December 2005
Proposed online date
December 2009
Withdrawn
March 2008

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Kern County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem