BATTERY STORAGE · CAISO

Pronghorn Energy Storage

Pronghorn Energy Storage is a 123 MW battery storage request withdrawn in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2022 (completed)
  2. Withdrawn / abandonedAug 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2194
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Antelope
Location
Los Angeles County, California
Technology
Battery: 123 MW
Total requested
123 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
13 June 2022
Proposed online date
June 2026
Withdrawn
August 2022

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.