United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 21

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 21 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Horse Lake Wind Project
Onshore wind
201 MWWithdrawn / abandoned Lassen, CACAISO May 2007target 2008
Barren Ridge Wind Project
Onshore wind
201 MWWithdrawn / abandoned Kern, CACAISO May 2004target 2010
Geysers Wind Project
Onshore wind
201 MWWithdrawn / abandoned Lake, CACAISO Mar 2004target 2009
Frazier Lake
Solar + storage
201 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Bullard Energy Center
Gas
201 MWWithdrawn / abandoned Fresno, CACAISO Dec 2004target 2008
Vanguard Solar BESS
Solar + storage
200 MWWithdrawn / abandoned Fresno, CACAISO May 2017target 2025
Blue SKY Wind Energy Center
Onshore wind
200 MWWithdrawn / abandoned Los Angeles, CACAISO Jul 2010target 2012
Lukrich Energy Center
Battery storage
200 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Citadel ESS
Battery storage
200 MWWithdrawn / abandoned Orange, CACAISO Apr 2019target 2023
Lotus 2 Solar Farm
Solar + storage
200 MWWithdrawn / abandoned Madera, CACAISO May 2017target 2020
Speedway ESS
Battery storage
200 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2019target 2024
Copper Cloud
Battery storage
200 MWWithdrawn / abandoned Merced, CACAISO Apr 2023target 2031
Desert Bell Solar
Solar
200 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2014
Pastoria Expansion II
Gas
200 MWWithdrawn / abandoned Kern, CACAISO Oct 2006target 2010
PVV-K Solar I
Solar
200 MWWithdrawn / abandoned Riverside, CACAISO May 2008target 2012
Demetra Energy Storage
Battery storage
200 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Fairmont Wind Generation Project
Onshore wind
200 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2003target 2007
Black Diamond Energy Storage 2
Battery storage
200 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2018target 2021
Mount Vernon Solar
Solar
200 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2020
Mount Signal Solar Farm III
Solar
200 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2014
Chuckwalla Solar I
Solar
200 MWWithdrawn / abandoned Riverside, CACAISO Aug 2007target 2009
Ancho Creek Solar
Solar
200 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
Weston Storage 2
Battery storage
200 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Goldwick Solar Farm
Solar + storage
200 MWWithdrawn / abandoned Stanislaus, CACAISO May 2017target 2020
Faraday Energy Storage
Battery storage
200 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Airport Solar PV 1
Solar
200 MWWithdrawn / abandoned Riverside, CACAISO Jul 2010target 2013
Zephyr Power Station
Gas
200 MWWithdrawn / abandoned San Joaquin, CACAISO Mar 2008target 2012
Anderson River BESS
Battery storage
200 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Moorhen Energy Storage
Battery storage
200 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2018target 2022
Palomas Solar Project
Solar
200 MWWithdrawn / abandoned Yuma, AZCAISO Apr 2015target 2018
El Segundo 3 & 4 Re-Power II
Other
200 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2007target 2013
Mount Signal Solar Farm II
Solar
200 MWWithdrawn / abandoned Imperial, CACAISO Jul 2010target 2014
Kramer Solar
Solar
200 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2013target 2016
Calhawk Solar Farm
Solar + storage
200 MWWithdrawn / abandoned Tulare, CACAISO May 2017target 2022
Gateway Energy Storage 2
Battery storage
200 MWWithdrawn / abandoned San Diego, CACAISO May 2016target 2019
Otay Mesa BESS
Battery storage
200 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2018
WP Oceanside
Gas
200 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2017
Van Oker
Battery storage
200 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Canela Energy Storage
Battery storage
200 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Milliken
Gas
200 MWWithdrawn / abandoned Riverside, CACAISO Apr 2007target 2010
WP Goleta (Fka WP Oxnard)
Gas
200 MWWithdrawn / abandoned Ventura, CACAISO Apr 2013target 2018
Silurian Valley Wind
Onshore wind
200 MWWithdrawn / abandoned San Bernardino, CACAISO Mar 2011target 2015
Lucerne Valley Solar Project, Phase 1
Solar
200 MWWithdrawn / abandoned San Bernardino, CACAISO Feb 2008target 2010
Daggett Solar Project
Solar
200 MWWithdrawn / abandoned San Bernardino, CACAISO Mar 2011target 2018
Mojave View Solar
Solar
200 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2013
Miranda ESS
Battery storage
200 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2019target 2023
GYPSY ESS
Battery storage
200 MWWithdrawn / abandoned San Diego, CACAISO Apr 2019target 2023
Mount Signal Solar Farm
Solar
200 MWWithdrawn / abandoned Imperial, CACAISO Feb 2010target 2014
Williams Energy Center
Gas
200 MWWithdrawn / abandoned Colusa, CACAISO May 2008target 2012
Cardinal Storage
Battery storage
200 MWWithdrawn / abandoned Imperial, CACAISO Apr 2019target 2028
Page 21 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)