OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 21
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Horse Lake Wind Project Onshore wind |
201 MW | Withdrawn / abandoned |
| Barren Ridge Wind Project Onshore wind |
201 MW | Withdrawn / abandoned |
| Geysers Wind Project Onshore wind |
201 MW | Withdrawn / abandoned |
| Frazier Lake Solar + storage |
201 MW | Withdrawn / abandoned |
| Bullard Energy Center Gas |
201 MW | Withdrawn / abandoned |
| Vanguard Solar BESS Solar + storage |
200 MW | Withdrawn / abandoned |
| Blue SKY Wind Energy Center Onshore wind |
200 MW | Withdrawn / abandoned |
| Lukrich Energy Center Battery storage |
200 MW | Withdrawn / abandoned |
| Citadel ESS Battery storage |
200 MW | Withdrawn / abandoned |
| Lotus 2 Solar Farm Solar + storage |
200 MW | Withdrawn / abandoned |
| Speedway ESS Battery storage |
200 MW | Withdrawn / abandoned |
| Copper Cloud Battery storage |
200 MW | Withdrawn / abandoned |
| Desert Bell Solar Solar |
200 MW | Withdrawn / abandoned |
| Pastoria Expansion II Gas |
200 MW | Withdrawn / abandoned |
| PVV-K Solar I Solar |
200 MW | Withdrawn / abandoned |
| Demetra Energy Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Fairmont Wind Generation Project Onshore wind |
200 MW | Withdrawn / abandoned |
| Black Diamond Energy Storage 2 Battery storage |
200 MW | Withdrawn / abandoned |
| Mount Vernon Solar Solar |
200 MW | Withdrawn / abandoned |
| Mount Signal Solar Farm III Solar |
200 MW | Withdrawn / abandoned |
| Chuckwalla Solar I Solar |
200 MW | Withdrawn / abandoned |
| Ancho Creek Solar Solar |
200 MW | Withdrawn / abandoned |
| Weston Storage 2 Battery storage |
200 MW | Withdrawn / abandoned |
| Goldwick Solar Farm Solar + storage |
200 MW | Withdrawn / abandoned |
| Faraday Energy Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Airport Solar PV 1 Solar |
200 MW | Withdrawn / abandoned |
| Zephyr Power Station Gas |
200 MW | Withdrawn / abandoned |
| Anderson River BESS Battery storage |
200 MW | Withdrawn / abandoned |
| Moorhen Energy Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Palomas Solar Project Solar |
200 MW | Withdrawn / abandoned |
| El Segundo 3 & 4 Re-Power II Other |
200 MW | Withdrawn / abandoned |
| Mount Signal Solar Farm II Solar |
200 MW | Withdrawn / abandoned |
| Kramer Solar Solar |
200 MW | Withdrawn / abandoned |
| Calhawk Solar Farm Solar + storage |
200 MW | Withdrawn / abandoned |
| Gateway Energy Storage 2 Battery storage |
200 MW | Withdrawn / abandoned |
| Otay Mesa BESS Battery storage |
200 MW | Withdrawn / abandoned |
| WP Oceanside Gas |
200 MW | Withdrawn / abandoned |
| Van Oker Battery storage |
200 MW | Withdrawn / abandoned |
| Canela Energy Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Milliken Gas |
200 MW | Withdrawn / abandoned |
| WP Goleta (Fka WP Oxnard) Gas |
200 MW | Withdrawn / abandoned |
| Silurian Valley Wind Onshore wind |
200 MW | Withdrawn / abandoned |
| Lucerne Valley Solar Project, Phase 1 Solar |
200 MW | Withdrawn / abandoned |
| Daggett Solar Project Solar |
200 MW | Withdrawn / abandoned |
| Mojave View Solar Solar |
200 MW | Withdrawn / abandoned |
| Miranda ESS Battery storage |
200 MW | Withdrawn / abandoned |
| GYPSY ESS Battery storage |
200 MW | Withdrawn / abandoned |
| Mount Signal Solar Farm Solar |
200 MW | Withdrawn / abandoned |
| Williams Energy Center Gas |
200 MW | Withdrawn / abandoned |
| Cardinal Storage Battery storage |
200 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)