BATTERY STORAGE Β· CAISO

Copper Cloud

Copper Cloud is a 200 MW battery storage request withdrawn in the CAISO interconnection queue, in Merced County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2346
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
LOS BANOS 500 kV
Location
Merced County, California
Technology
Battery: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
Caiso Cluster 15 Unvalidated
Queue status
Withdrawn
Entered queue
17 April 2023
Proposed online date
December 2031
Withdrawn
December 2025

Location

Marker shows the centre of Merced County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Merced County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem