🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

GAS · CAISO

Zephyr Power Station

Zephyr Power Station is a 200 MW gas request withdrawn in the CAISO interconnection queue, in San Joaquin County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
306
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Tesla-Belota 230kV and Tesla-Webber 230kV lines
Location
San Joaquin County, California
Technology
Gas: 200 MW
Total requested
200 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
11 March 2008
Proposed online date
May 2012
Withdrawn
November 2008

Location

Marker shows the centre of San Joaquin County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Joaquin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem