United States › Grid › Interconnection queues › California

OTHER · CAISO

El Segundo 3 & 4 Re-Power II

El Segundo 3 & 4 Re-Power II is a 200 MW other request withdrawn in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2007 (completed)
  2. Withdrawn / abandonedJun 2007 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
206
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
El Sequndo 230kV Switchyard
Location
Los Angeles County, California
Technology
Solar: 200 MW · Gas
Total requested
200 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
23 April 2007
Proposed online date
January 2013
Withdrawn
June 2007

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Los Angeles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem