United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Chuckwalla Solar I

Chuckwalla Solar I is a 200 MW solar request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2007 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
251
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Eagle Mountain-Blythe 161kV line
Location
Riverside County, California
Technology
Solar: 200 MW
Total requested
200 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 August 2007
Proposed online date
December 2009
Withdrawn
November 2008

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Riverside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem