Fairmont Wind Generation Project

Fairmont Wind Generation Project is a 200 MW onshore wind request withdrawn in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2003 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Antelope
Location
Los Angeles County, California
Technology
Wind: 200 MW
Total requested
200 MW
Study phase
In Progress
Queue status
Withdrawn
Entered queue
15 April 2003
Proposed online date
December 2007

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Los Angeles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem