United States โบ Grid โบ Interconnection queues
OCTARY USA ยท INTERCONNECTION QUEUESWithdrawn queue requests in the USA (2023 requests) โ page 18
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solstice Other |
206 MW | Withdrawn / abandoned |
| Kane Battery storage |
206 MW | Withdrawn / abandoned |
| Calico Peak Energy Storage Facility Battery storage |
206 MW | Withdrawn / abandoned |
| Eagleman Battery storage |
206 MW | Withdrawn / abandoned |
| Fortis 2 Battery storage |
206 MW | Withdrawn / abandoned |
| Krahill Battery storage |
206 MW | Withdrawn / abandoned |
| Griffin Battery storage |
206 MW | Withdrawn / abandoned |
| Malala Storage Battery storage ยท Malala Storage, LLC |
206 MW | Withdrawn / abandoned |
| Wallie Storage Battery storage ยท Wallie Storage, LLC |
205 MW | Withdrawn / abandoned |
| Fort Watt Storage Battery storage ยท Fort Watt Storage, LLC |
205 MW | Withdrawn / abandoned |
| Maravillosa Solar 1 Solar + storage |
205 MW | Withdrawn / abandoned |
| Antelope Plains Solar Solar + storage |
205 MW | Withdrawn / abandoned |
| Quaking Aspen Storage Solar + storage |
205 MW | Withdrawn / abandoned |
| Castleberry Battery storage |
205 MW | Withdrawn / abandoned |
| Songbird BESS Battery storage |
205 MW | Withdrawn / abandoned |
| Melon Patch Solar Solar + storage |
205 MW | Withdrawn / abandoned |
| Grand BESS Battery storage |
205 MW | Withdrawn / abandoned |
| Chardonnay Storage Center Battery storage |
205 MW | Withdrawn / abandoned |
| Montrose Storage Battery storage |
205 MW | Withdrawn / abandoned |
| Sagitta Battery storage |
205 MW | Withdrawn / abandoned |
| Sullivan Energy Center Solar + storage |
205 MW | Withdrawn / abandoned |
| Double Butte 2 Battery storage |
204 MW | Withdrawn / abandoned |
| Barbaro Storage Battery storage |
204 MW | Withdrawn / abandoned |
| Plumb Solar + storage |
204 MW | Withdrawn / abandoned |
| Ibra Storage Battery storage |
203 MW | Withdrawn / abandoned |
| Ronaldo Storage Battery storage |
203 MW | Withdrawn / abandoned |
| Icebox Energy Storage Battery storage ยท Grid Connected Infrastructure, LLC |
202 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
202 MW | Withdrawn / abandoned |
| Hydrus Energy Storage Battery storage |
202 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2023-006, Barton County Onshore wind |
202 MW | Withdrawn / abandoned |
| Taurus Energy Storage Battery storage |
202 MW | Withdrawn / abandoned |
| Jerboa BESS Battery storage ยท Jerboa Storage, LLC |
201 MW | Withdrawn / abandoned |
| Honey Bear Solar + storage |
201 MW | Withdrawn / abandoned |
| Oso Negro Solar + storage |
201 MW | Withdrawn / abandoned |
| Yellow Rose BESS Battery storage ยท Black Mountain Energy Storage II |
201 MW | Withdrawn / abandoned |
| Frazier Lake Solar + storage |
201 MW | Withdrawn / abandoned |
| Wadsworth Storage Energy Center Battery storage ยท Nova Clean Energy Real Estate, LLC |
201 MW | Withdrawn / abandoned |
| Silver Spur Energy Center Battery storage ยท Silver Spur Energy Center, LLC |
201 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
201 MW | Withdrawn / abandoned |
| Blue Bird BESS Other ยท Gigawatt Solar LLC |
201 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2023-003, Hughes County Onshore wind |
201 MW | Withdrawn / abandoned |
| Gold Rush Energy Storage Other ยท Goldthwaite Energy Storage, LLC |
201 MW | Withdrawn / abandoned |
| Battery storage project GEN-2023-019, Tillman County Battery storage |
200 MW | Withdrawn / abandoned |
| Lukrich Energy Center Battery storage |
200 MW | Withdrawn / abandoned |
| Solar + storage project GEN-2023-083, Banner County Solar + storage |
200 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
200 MW | Withdrawn / abandoned |
| Cumbia Energy Center Battery storage ยท Cumbia Energy Center, LLC |
200 MW | Withdrawn / abandoned |
| Battery storage project Q107, Pinal County Battery storage |
200 MW | Withdrawn / abandoned |
| Battery storage project 574, Montgomery County Battery storage |
200 MW | Withdrawn / abandoned |
| Solar + storage project 542, Pontotoc County Solar + storage |
200 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)486 ยท 198.6 GW
- West (non-ISO utilities)547 ยท 166.5 GW
- SPP (Southwest Power Pool)336 ยท 71.5 GW
- NYISO (New York)138 ยท 40.7 GW
- Southeast (non-ISO utilities)331 ยท 40.7 GW
- ERCOT (Texas)85 ยท 16.1 GW
- ISO-NE (New England)119 ยท 15.7 GW
- MISO (Midcontinent)10 ยท 1,143 MW
- PJM (Mid-Atlantic, Midwest)11 ยท 867 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)