Withdrawn queue requests in the USA (2023 requests) โ€” page 18

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,063551.8 GW
Active in queue298.6 GW1,249 requests
Agreement signed34.6 GW168 requests
Withdrawn2,063551.8 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,063 requests ยท page 18 of 42
ProjectCapacityStatusLocationRegionQueuedOnline
Solstice
Other
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Kane
Battery storage
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Calico Peak Energy Storage Facility
Battery storage
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Eagleman
Battery storage
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Fortis 2
Battery storage
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Krahill
Battery storage
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Griffin
Battery storage
206 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Malala Storage
Battery storage ยท Malala Storage, LLC
206 MWWithdrawn / abandoned ERCOT Oct 2023target 2028
Wallie Storage
Battery storage ยท Wallie Storage, LLC
205 MWWithdrawn / abandoned ERCOT Mar 2023target 2027
Fort Watt Storage
Battery storage ยท Fort Watt Storage, LLC
205 MWWithdrawn / abandoned Tarrant, TXERCOT Jan 2023target 2027
Maravillosa Solar 1
Solar + storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Antelope Plains Solar
Solar + storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Quaking Aspen Storage
Solar + storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Castleberry
Battery storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Songbird BESS
Battery storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Melon Patch Solar
Solar + storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Grand BESS
Battery storage
205 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2023target 2028
Chardonnay Storage Center
Battery storage
205 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2023target 2030
Montrose Storage
Battery storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Sagitta
Battery storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Sullivan Energy Center
Solar + storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Double Butte 2
Battery storage
204 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Barbaro Storage
Battery storage
204 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Plumb
Solar + storage
204 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Ibra Storage
Battery storage
203 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Ronaldo Storage
Battery storage
203 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Icebox Energy Storage
Battery storage ยท Grid Connected Infrastructure, LLC
202 MWWithdrawn / abandoned Onondaga, NYNYISO Aug 2023
Battery Storage
Battery storage
202 MWWithdrawn / abandoned Hampden, MAISO-NE Dec 2023target 2028
Hydrus Energy Storage
Battery storage
202 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Onshore wind project GEN-2023-006, Barton County
Onshore wind
202 MWWithdrawn / abandoned Barton, MOSPP Oct 2023target 2029
Taurus Energy Storage
Battery storage
202 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Jerboa BESS
Battery storage ยท Jerboa Storage, LLC
201 MWWithdrawn / abandoned ERCOT Aug 2023target 2027
Honey Bear
Solar + storage
201 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Oso Negro
Solar + storage
201 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Yellow Rose BESS
Battery storage ยท Black Mountain Energy Storage II
201 MWWithdrawn / abandoned ERCOT Oct 2023target 2027
Frazier Lake
Solar + storage
201 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Wadsworth Storage Energy Center
Battery storage ยท Nova Clean Energy Real Estate, LLC
201 MWWithdrawn / abandoned ERCOT Oct 2023target 2026
Silver Spur Energy Center
Battery storage ยท Silver Spur Energy Center, LLC
201 MWWithdrawn / abandoned ERCOT Dec 2023target 2027
Battery Storage
Battery storage
201 MWWithdrawn / abandoned Fairfield, CTISO-NE Mar 2023target 2026
Blue Bird BESS
Other ยท Gigawatt Solar LLC
201 MWWithdrawn / abandoned Hood, TXERCOT Jun 2023target 2026
Onshore wind project GEN-2023-003, Hughes County
Onshore wind
201 MWWithdrawn / abandoned Hughes, OKSPP Jul 2023target 2026
Gold Rush Energy Storage
Other ยท Goldthwaite Energy Storage, LLC
201 MWWithdrawn / abandoned Mills, TXERCOT Aug 2023target 2026
Battery storage project GEN-2023-019, Tillman County
Battery storage
200 MWWithdrawn / abandoned Tillman, OKSPP Oct 2023target 2026
Lukrich Energy Center
Battery storage
200 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Solar + storage project GEN-2023-083, Banner County
Solar + storage
200 MWWithdrawn / abandoned Banner, NESPP Oct 2023target 2027
Battery Storage
Battery storage
200 MWWithdrawn / abandoned Rockingham, NHISO-NE Sep 2023target 2026
Cumbia Energy Center
Battery storage ยท Cumbia Energy Center, LLC
200 MWWithdrawn / abandoned Nueces, TXERCOT Mar 2023target 2028
Battery storage project Q107, Pinal County
Battery storage
200 MWWithdrawn / abandoned Pinal, AZWest May 2023target 2027
Battery storage project 574, Montgomery County
Battery storage
200 MWWithdrawn / abandoned Montgomery, TNSoutheast Jun 2023
Solar + storage project 542, Pontotoc County
Solar + storage
200 MWWithdrawn / abandoned Pontotoc, MSSoutheast Apr 2023target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)