Grand BESS

Grand BESS is a 205 MW battery storage request withdrawn in the CAISO interconnection queue, in Santa Clara County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2278
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
PIERCY 115 kV
Location
Santa Clara County, California
Technology
Battery: 205 MW
Total requested
205 MW
Service type
Network resource (NRIS)
Study phase
Caiso Cluster 15 Unvalidated
Queue status
Withdrawn
Entered queue
17 April 2023
Proposed online date
December 2028
Withdrawn
December 2025

Location

Marker shows the centre of Santa Clara County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Santa Clara County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem