Withdrawn queue requests in CAISO (California) — page 14

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 14 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Robin 2
Solar + storage
308 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2023
Hinson BESS
Battery storage
308 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2019target 2022
Genoa Energy Storage 2
Battery storage
308 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Baylands Power Bank
Battery storage
308 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Casy Solar
Solar + storage
308 MWWithdrawn / abandoned Fresno, CACAISO Apr 2018target 2022
Hog Island
Solar + storage
307 MWWithdrawn / abandoned Tulare, CACAISO Apr 2021target 2024
Vantage
Battery storage
307 MWWithdrawn / abandoned San Diego, CACAISO Apr 2023target 2030
Mountain Valley Storage
Battery storage
306 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Warm Water
Battery storage
306 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Barbosa
Battery storage
306 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Grape Valley Storage
Battery storage
306 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Copernicus
Solar + storage
306 MWWithdrawn / abandoned CACAISO Apr 2021target 2024
Nikola Norte
Solar + storage
306 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2019target 2023
Hidden Hills Solar 1
Solar
306 MWWithdrawn / abandoned Inyo, CACAISO May 2017target 2021
Tesoster
Solar + storage
306 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2019target 2023
Nikovaster
Solar + storage
306 MWWithdrawn / abandoned Stanislaus, CACAISO Apr 2019target 2023
Muir Storage
Battery storage
305 MWWithdrawn / abandoned Marin, CACAISO Apr 2020target 2025
Sevillano
Solar
305 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Mission Rock Energy Center (Fka Mission Rock Energy Center Flex)
Gas
305 MWWithdrawn / abandoned Ventura, CACAISO Apr 2014target 2019
Superba Storage 1
Battery storage
305 MWWithdrawn / abandoned Orange, CACAISO Apr 2019target 2021
Epps Storage
Battery storage
305 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2021target 2026
Heartland PV
Solar
305 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Flamingo
Battery storage
304 MWWithdrawn / abandoned Alameda, CACAISO Apr 2023target 2030
Sciurus
Battery storage
304 MWWithdrawn / abandoned Orange, CACAISO Apr 2021target 2028
Paladin
Battery storage
304 MWWithdrawn / abandoned Orange, CACAISO Apr 2021target 2024
Arcturus
Solar + storage
304 MWWithdrawn / abandoned Kern, CACAISO Apr 2019target 2026
Vernon Power Plant Expansion Project
Gas
304 MWWithdrawn / abandoned Los Angeles, CACAISO May 2006target 2009
Marcus Storage
Battery storage
304 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Ace
Battery storage
304 MWWithdrawn / abandoned Alameda, CACAISO Apr 2023target 2030
Amber Ray
Battery storage
304 MWWithdrawn / abandoned San Diego, CACAISO Apr 2021target 2027
Finke River
Solar + storage
304 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2024
Balsam
Solar + storage
304 MWWithdrawn / abandoned Alameda, CACAISO Apr 2021target 2024
Sugarloaf Hybrid Solar
Solar + storage
303 MWWithdrawn / abandoned Fresno, CACAISO Apr 2019target 2022
Dunnigan
Onshore wind
301 MWWithdrawn / abandoned Yolo, CACAISO Mar 2011target 2014
Dutchmans Pass
Solar + storage
301 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Cordelia Hills Wind Power Plant
Onshore wind
301 MWWithdrawn / abandoned Napa, CACAISO Nov 2011target 2016
Barren Ridge II
Onshore wind
300 MWWithdrawn / abandoned Kern, CACAISO Jul 2004target 2011
Nevada 300
Solar
300 MWWithdrawn / abandoned Clark, NVCAISO Jul 2010target 2014
Desert Quartzite Solar
Solar
300 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2015
Hyder Valley Solar Energy
Solar
300 MWWithdrawn / abandoned Maricopa, AZCAISO Apr 2013target 2018
Enn Mojave Power 4
Other
300 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Troy Lake Soleil
Solar
300 MWWithdrawn / abandoned San Bernardino, CACAISO Jan 2008target 2011
Eagle Mountain
Solar
300 MWWithdrawn / abandoned Riverside, CACAISO Mar 2007target 2010
Pachacamac 2
Battery storage
300 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Separator Unit 2
Battery storage
300 MWWithdrawn / abandoned Orange, CACAISO Apr 2021target 2031
Delilah Energy Storage 2
Battery storage
300 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Calcium Energy Storage
Battery storage
300 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
PVV-M Solar I
Solar
300 MWWithdrawn / abandoned Riverside, CACAISO May 2008target 2012
Pachacamac 1
Battery storage
300 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Speedway ESS 2
Battery storage
300 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2020target 2024
Page 14 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)