United States › Grid › Interconnection queues › California

GAS · CAISO

Vernon Power Plant Expansion Project

Vernon Power Plant Expansion Project is a 304 MW gas request withdrawn in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2006 (completed)
  2. Withdrawn / abandonedSep 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
104
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Laguna Bell Sub 230 kV Bus
Location
Los Angeles County, California
Technology
Gas: 304 MW
Total requested
304 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
3 May 2006
Proposed online date
July 2009
Withdrawn
September 2009

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Los Angeles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem