🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Superba Storage 1

Superba Storage 1 is a 305 MW battery storage request withdrawn in the CAISO interconnection queue, in Orange County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedApr 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1610
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Johanna Substation 230 kV
Location
Orange County, California
Technology
Battery: 305 MW
Total requested
305 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
December 2021
Withdrawn
April 2020

Location

Marker shows the centre of Orange County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Orange County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem