SOLAR · CAISO

Troy Lake Soleil

Troy Lake Soleil is a 300 MW solar request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2008 (completed)
  2. Withdrawn / abandonedDec 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
295
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Pisgah Substation 220kV
Location
San Bernardino County, California
Technology
Solar: 300 MW
Total requested
300 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
17 January 2008
Proposed online date
December 2011
Withdrawn
December 2009

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem