United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in Texas — page 13
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Cado Storage Battery storage · Cado Storage, LLC |
206 MW | In study |
| Trivor BESS Battery storage · BRP Trivor BESS LLC |
206 MW | In study |
| Pleiades Storage Battery storage · Pleiades Storage, LLC |
206 MW | In study |
| Sisters Solar II Solar + storage · Oberon Solar III, LLC |
206 MW | In study |
| BRP Triton BESS Battery storage · BRP Triton BESS LLC |
205 MW | In study |
| Hittson Creek BESS Solar + storage · 174 Power Global Properties |
205 MW | In study |
| Soda Lake BESS 2 SLF Solar + storage · Crane II Solar Electric, LLC |
205 MW | In study |
| Tri-X BESS 1 SLF Solar + storage · Crane I Solar Electric, LLC |
205 MW | In study |
| Shaula III Solar Solar + storage · Shaula Energy Project III, LLC |
205 MW | In study |
| Allthorn BESS Solar + storage · ALLTHORN SOLAR, LLC |
205 MW | In study |
| Les Energy Storage Battery storage · Rocky Mountain Energy Development, LLC |
205 MW | In study |
| Sepik BESS Battery storage · BRP Sepik BESS LLC |
205 MW | In study |
| Tomahawk Road BESS Battery storage · Horizon Energy Storage Greenfield Project Holdings LLC |
205 MW | In study |
| Taylor County Paul Storage Battery storage · DM-TCP, LLC |
205 MW | In study |
| Bell County Leifester Storage Battery storage · DM-BCRCML, LLC |
205 MW | In study |
| Energy City BESS Battery storage · Energy City BESS LLC |
205 MW | In study |
| Calico BESS Battery storage · Nova Clean Energy LLC |
205 MW | In study |
| Citrus Grove Energy Storage Battery storage |
205 MW | Paused / redesign |
| Reynolds Park BESS Battery storage |
205 MW | Paused / redesign |
| Guitar BESS Battery storage · Guitar BESS LLC |
205 MW | In study |
| Lightning Ridge Energy Storage Battery storage · Lightning Ridge Storage LLC |
205 MW | In study |
| Carolina Storage Midland Battery storage · CSE Storage, LLC |
205 MW | In study |
| Running Iron Solar Solar · Running Iron Solar, LLC |
205 MW | In study |
| Prospector Energy Storage Battery storage · Prospector Storage LLC |
205 MW | In study |
| Utica Solar Solar |
205 MW | Paused / redesign |
| Arc Energy Storage Battery storage · Paris Energy Storage, LLC |
205 MW | In study |
| South Tripoint BESS Battery storage · South Triangle Energy, LLC |
205 MW | In study |
| Cornwall Solar Solar |
205 MW | Paused / redesign |
| Drill Baby Drill BESS Battery storage · SBESS TX8 LLC |
204 MW | In study |
| Urca Solar Solar |
204 MW | Paused / redesign |
| Hoskins Solar Solar · SGT HOSKINS SOLAR PROJECT, LLC |
204 MW | In study |
| Sonora High Noon BESS Battery storage · Sonora High Noon, LLC |
204 MW | In study |
| Fermata BESS Battery storage · Fermata BESS, LLC |
204 MW | In study |
| Stockdale BESS Battery storage |
204 MW | Paused / redesign |
| Utica BESS Battery storage |
204 MW | Paused / redesign |
| Chimney Creek Solar Solar · Chimney Creek Energy, LLC |
204 MW | In study |
| Cornwall BESS Battery storage |
204 MW | Paused / redesign |
| Sierra Diablo Energy Storage Battery storage · SIERRA DIABLO ENERGY STORAGE LLC |
204 MW | In study |
| Sultan BESS Battery storage |
204 MW | Paused / redesign |
| Ringtail Energy Storage Battery storage · PowerPulse LLC |
204 MW | In study |
| Diamondback BESS Battery storage |
204 MW | Paused / redesign |
| Mercury Solar III Solar + storage · Mercury Solar |
204 MW | In study |
| Owens Solar Solar · Owens Solar LLC |
204 MW | Paused / redesign |
| Timberlakes Solar Solar · Donegalsol |
204 MW | In study |
| Marcelina Storage Battery storage · Marcelina Solar, LLC |
203 MW | In study |
| Kinenos Solar Solar · Encino del Sol Energy, LLC |
203 MW | In study |
| Loma Pinta Solar Solar · Loma Pinta Wind Energy, LLC |
203 MW | In study |
| Brahman Renewables Storage Solar + storage · Brahman Renewables |
203 MW | In study |
| Caracara Energy Storage Center Battery storage · FRESH AIR ENERGY II, LLC |
203 MW | In study |
| Charro Creek Solar 1 SLF Solar + storage · Charro Creek Solar LLC |
203 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,398 · 327.9 GW
- SPP (Southwest Power Pool)61 · 16.6 GW
- MISO (Midcontinent)22 · 6,012 MW
- West (non-ISO utilities)5 · 997 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)