United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 13
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Collis Solar + storage |
321 MW | Withdrawn / abandoned |
| Morning Star Solar + storage |
321 MW | Withdrawn / abandoned |
| Occident Solar + storage |
321 MW | Withdrawn / abandoned |
| Buckhorn Solar + storage |
321 MW | Withdrawn / abandoned |
| Salome Solar + storage |
321 MW | Withdrawn / abandoned |
| Luz Solar Partners Solar |
320 MW | Withdrawn / abandoned |
| Wre - Vestal (49/480MW) Solar |
320 MW | Withdrawn / abandoned |
| Kanoa Solar Solar + storage |
320 MW | Withdrawn / abandoned |
| Callinan Solar And Storage Solar + storage |
320 MW | Withdrawn / abandoned |
| Tule Fog Solar Solar + storage |
317 MW | Withdrawn / abandoned |
| CPV California III Gas |
315 MW | Withdrawn / abandoned |
| Yellowfin Battery storage |
315 MW | Withdrawn / abandoned |
| CPV California IV Gas |
315 MW | Withdrawn / abandoned |
| CPV California V Gas |
315 MW | Withdrawn / abandoned |
| Island Energy Center Gas |
315 MW | Withdrawn / abandoned |
| Tamalpais Energy Storage Battery storage |
314 MW | Withdrawn / abandoned |
| Borealis Energy Storage Battery storage |
314 MW | Withdrawn / abandoned |
| Wardenclyffe Battery storage |
314 MW | Withdrawn / abandoned |
| Parachute Battery storage |
313 MW | Withdrawn / abandoned |
| Monkey Flower Battery storage |
313 MW | Withdrawn / abandoned |
| Tortuga Battery storage |
313 MW | Withdrawn / abandoned |
| Crossroads 2 Battery storage |
313 MW | Withdrawn / abandoned |
| Luzen Solar Energy Center Solar + storage |
313 MW | Withdrawn / abandoned |
| Farm Bell Energy Center Solar + storage |
313 MW | Withdrawn / abandoned |
| Crossroads Storage Battery storage |
313 MW | Withdrawn / abandoned |
| North Almond Energy Center Solar + storage |
313 MW | Withdrawn / abandoned |
| Desert Senna Energy Center Solar + storage |
313 MW | Withdrawn / abandoned |
| Harquahala Sun Solar + storage |
313 MW | Withdrawn / abandoned |
| Silverwing Solar + storage |
312 MW | Withdrawn / abandoned |
| Bounty (Formly East Kern Hybrid) Solar + storage |
311 MW | Withdrawn / abandoned |
| Clarion Energy Center Battery storage |
311 MW | Withdrawn / abandoned |
| Pelican Island Solar |
311 MW | Withdrawn / abandoned |
| Century Solar Solar |
310 MW | Withdrawn / abandoned |
| Fort Mojave Solar Solar |
310 MW | Withdrawn / abandoned |
| Badger Flat Battery storage |
310 MW | Withdrawn / abandoned |
| Prospect Energy Center Gas |
310 MW | Withdrawn / abandoned |
| Twilight Solar + storage |
310 MW | Withdrawn / abandoned |
| Homestead Energy Center Battery storage |
310 MW | Withdrawn / abandoned |
| Redpoint Solar + storage |
310 MW | Withdrawn / abandoned |
| Anacapa Solar + storage |
309 MW | Withdrawn / abandoned |
| Sand Solar Solar |
309 MW | Withdrawn / abandoned |
| Key Storage 2 Battery storage |
309 MW | Withdrawn / abandoned |
| Diablo Energy Facility Gas |
309 MW | Withdrawn / abandoned |
| Marnier Solar + storage |
309 MW | Withdrawn / abandoned |
| HillRich Battery storage |
309 MW | Withdrawn / abandoned |
| Barrenspring Solar + storage |
308 MW | Withdrawn / abandoned |
| Vestal Valley Solar + storage |
308 MW | Withdrawn / abandoned |
| Japatul Valley Storage Battery storage |
308 MW | Withdrawn / abandoned |
| San Bernardino BESS Battery storage |
308 MW | Withdrawn / abandoned |
| Syrah Storage Center Battery storage |
308 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)