United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR + STORAGE Β· CAISO

Barrenspring

Barrenspring is a 308 MW solar + storage request withdrawn in the CAISO interconnection queue, in Tulare County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedFeb 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1622
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Springville-Rector 220kV line
Location
Tulare County, California
Technology
Solar: 244 MW Β· Battery: 64.2 MW
Total requested
308 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
April 2023
Withdrawn
February 2020

Location

Marker shows the centre of Tulare County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Tulare County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem