🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

GAS · CAISO

Island Energy Center

Island Energy Center is a 315 MW gas request withdrawn in the CAISO interconnection queue, in San Joaquin County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
373
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Loop Tesla Stagg and Tesla-Eight Mile 230 kV lines
Location
San Joaquin County, California
Technology
Gas: 315 MW
Total requested
315 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
27 May 2008
Proposed online date
July 2012
Withdrawn
November 2008

Location

Marker shows the centre of San Joaquin County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Joaquin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem