United States βΊ Grid βΊ Interconnection queues βΊ California
BATTERY STORAGE Β· CAISOTortuga
Tortuga is a 313 MW battery storage request withdrawn in the CAISO interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- caiso_c15_470
- Grid region
- CAISO (California)
- Connection point (POI)
- Bay Boulevard 230kV
- Location
- California
- Technology
- Battery: 313 MW
- Total requested
- 313 MW
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 17 April 2023
- Proposed online date
- June 2027
- Withdrawn
- December 2024
Location
No county location in the queue data.
Power plants in California Β· Transmission lines in California
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem