United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in NYISO (New York) — page 11
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Stewart Rock Energy Storage Battery storage · NYG Energy LLC |
150 MW | Withdrawn / abandoned |
| Dean Wind Onshore wind · Gamesa Energy USA, LLC |
150 MW | Withdrawn / abandoned |
| Silverline Energy Center Solar + storage · Silverline Energy Center, LLC |
150 MW | Withdrawn / abandoned |
| North Chelsea (Fieldstone Power Station) Battery storage · Fieldstone Power Station LLC |
150 MW | Withdrawn / abandoned |
| Krenzer Solar · ACE DevCo NC, LLC |
150 MW | Withdrawn / abandoned |
| Black Cherry Wind 2 Onshore wind · Black Cherry Wind Power, LLC |
150 MW | Withdrawn / abandoned |
| Orion Energy NY III Other · Orion Energy, LLC |
150 MW | Withdrawn / abandoned |
| Far Rockaway Energy Storage Center Battery storage · sPower Development Company, LLC |
150 MW | Withdrawn / abandoned |
| Northport-Norwalk Upgrade Other · KeySpan Energy for LIPA |
150 MW | Withdrawn / abandoned |
| Salt Rush Wind Energy Onshore wind · Salt Rush Wind Energy LLC |
150 MW | Withdrawn / abandoned |
| Lincoln Park Battery storage · BayWa r.e. Development LLC |
150 MW | Withdrawn / abandoned |
| Canisteo Hills Windfarm Onshore wind · Invenergy NY, LLC |
149 MW | Withdrawn / abandoned |
| Stonewall Solar, LLC. Solar · Stonewall Solar, LLC |
145 MW | Withdrawn / abandoned |
| Stonewall Solar Solar + storage · Stonewall Solar LLC |
145 MW | Withdrawn / abandoned |
| NY Kinetic Plant 1 Hydro · Hydroelectric Corporation |
144 MW | Withdrawn / abandoned |
| NY Oswego 200 Erie St Storage Battery storage · McMullen Pond LLC |
142 MW | Withdrawn / abandoned |
| Long Island Offshore Wind Offshore wind · FPL Energy |
140 MW | Withdrawn / abandoned |
| Queen Energy Center Battery storage · Mission Clean Energy Devco, LLC |
140 MW | Withdrawn / abandoned |
| Golden Knight Solar Solar · Golden Knight Solar, LLC |
140 MW | Withdrawn / abandoned |
| Golden Knight Solar Solar · Golden Knight Solar, LLC |
140 MW | Withdrawn / abandoned |
| Ramadi Utility Battery storage · YSG Community Solar |
140 MW | Withdrawn / abandoned |
| Gunns Corners Solar Solar · Northland Power U.S. Projects Inc |
140 MW | Withdrawn / abandoned |
| Ramadi Utility Battery storage · YSG Land Holdings, LLC |
140 MW | Withdrawn / abandoned |
| Ontario Valley Solar Solar + storage · Ontario Valley Solar 1, LLC |
135 MW | Withdrawn / abandoned |
| Bone Run Wind Onshore wind · Atlantic Wind, LLC |
132 MW | Withdrawn / abandoned |
| Wild Ox Solar Solar + storage · Wild Ox Solar Project, LLC |
132 MW | Withdrawn / abandoned |
| NY Interconnection 3 Battery storage · NY Interconnection LLC |
130 MW | Withdrawn / abandoned |
| Crane Brook Solar Project, LLC Solar · Crane Brook Solar Project |
130 MW | Withdrawn / abandoned |
| Mulberry Energy Storage Battery storage · Mulberry Energy Storage 1, LLC |
130 MW | Withdrawn / abandoned |
| Mainesburg ESS Battery storage · Juno Power Management LLC |
130 MW | Withdrawn / abandoned |
| NY115 - Newport Solar Solar · Newport Deerfield Solar LLC |
130 MW | Withdrawn / abandoned |
| NY115 - Newport Solar Solar · Newport Deerfield Solar |
130 MW | Withdrawn / abandoned |
| Mulberry Energy Storage Battery storage · Mulberry Energy Storage 1, LLC |
130 MW | Withdrawn / abandoned |
| West Babylon Battery storage · 174 Power Global Properties |
130 MW | Withdrawn / abandoned |
| Wild Ox Solar Solar + storage · Wild Ox Solar Project, LLC |
130 MW | Withdrawn / abandoned |
| Moose Creek 1 Battery storage · Emeren US, LLC |
130 MW | Withdrawn / abandoned |
| NY115 - Newport Solar Solar · Newport Deerfield Solar LLC |
130 MW | Withdrawn / abandoned |
| Cross County Energy Storage Battery storage · HW Power, LLC |
130 MW | Withdrawn / abandoned |
| 130 MW Uprate Gas · Liberty Generating Co. |
130 MW | Withdrawn / abandoned |
| Greenwood Heights Energy Storage Battery storage · the New York Power Authority |
130 MW | Withdrawn / abandoned |
| Wethersfield Windfield 115kV Onshore wind · Noble Environmental Power, LLC |
129 MW | Withdrawn / abandoned |
| Ravenswood Energy Storage 2 Battery storage · Helix Ravenswood, LLC |
129 MW | Withdrawn / abandoned |
| Ravenswood Energy Storage 1 Battery storage · Helix Ravenswood, LLC |
129 MW | Withdrawn / abandoned |
| NY Wind - Mott Haven Uprate Onshore wind · Bay State Wind |
128 MW | Withdrawn / abandoned |
| Gravel Road Solar Solar · Gravel Road Solar, LLC |
128 MW | Withdrawn / abandoned |
| Gravel Road Solar Solar · Genesee River Solar |
128 MW | Withdrawn / abandoned |
| Horse Creek Wind Onshore wind · Atlantic Wind, LLC |
126 MW | Withdrawn / abandoned |
| Gravel Road Solar Solar · Tyre Solar Energy Center |
126 MW | Withdrawn / abandoned |
| South Dow 2 (Lucy's Energy Reserve 2) Battery storage · Lucy?s Energy Reserve LLC |
125 MW | Withdrawn / abandoned |
| Bunker Solar Energy Center Battery storage · EDF Renewables Development, Inc. |
125 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)