United States βΊ Grid βΊ Interconnection queues βΊ New York
SOLAR + STORAGE Β· NYISOWild Ox Solar
Wild Ox Solar is a 130 MW solar + storage request withdrawn in the NYISO interconnection queue, in Yates County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-116
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Wild Ox Solar Project, LLC
- Connection point (POI)
- Eelpot Road to Flat St Substations 115 kV line
- Location
- Yates County, New York
- Technology
- Solar: 130 MW Β· Battery
- Total requested
- 130 MW
- Queue status
- Withdrawn
- Entered queue
- 30 August 2024
Location
Marker shows the centre of Yates County; the queue data does not give exact sites.
Other requests in Yates County
- Greenidge Unit #4Gas Β· 106 MW Β· built
- Greenidge Unit #4Gas Β· 106 MW Β· built
- Wild Ox SolarSolar + storage Β· 132 MW Β· withdrawn
- Budbreak Storage IBattery storage Β· 100 MW Β· withdrawn
- Budbreak Solar IISolar Β· 100 MW Β· withdrawn
- Budbreak Solar ISolar Β· 100 MW Β· withdrawn
- Budbreak Storage IIBattery storage Β· 100 MW Β· withdrawn
- Western Door WindOnshore wind Β· 100 MW Β· withdrawn
- Prattsburgh Wind FarmOnshore wind Β· 78.2 MW Β· withdrawn
- Prattsburgh Wind ParkOnshore wind Β· 55.5 MW Β· withdrawn
- Barrington SolarSolar Β· 18.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem