ONSHORE WIND Β· NYISOWestern Door Wind
Western Door Wind is a 100 MW onshore wind request withdrawn in the NYISO interconnection queue, in Yates County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2007 (completed)
- Withdrawn / abandonedJan 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 239
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Western Door Wind, LLC
- Connection point (POI)
- Greenidge βΓͺ Haley Rd. 115kV
- Location
- Yates County, New York
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Queue status
- Withdrawn
- Entered queue
- 30 January 2007
- Withdrawn
- January 2012
Location
Marker shows the centre of Yates County; the queue data does not give exact sites.
Other requests in Yates County
- Greenidge Unit #4Gas Β· 106 MW Β· built
- Greenidge Unit #4Gas Β· 106 MW Β· built
- Wild Ox SolarSolar + storage Β· 132 MW Β· withdrawn
- Wild Ox SolarSolar + storage Β· 130 MW Β· withdrawn
- Budbreak Storage IBattery storage Β· 100 MW Β· withdrawn
- Budbreak Solar IISolar Β· 100 MW Β· withdrawn
- Budbreak Solar ISolar Β· 100 MW Β· withdrawn
- Budbreak Storage IIBattery storage Β· 100 MW Β· withdrawn
- Prattsburgh Wind FarmOnshore wind Β· 78.2 MW Β· withdrawn
- Prattsburgh Wind ParkOnshore wind Β· 55.5 MW Β· withdrawn
- Barrington SolarSolar Β· 18.4 MW Β· withdrawn