United States › Grid › Interconnection queues › New York
ONSHORE WIND · NYISOPrattsburgh Wind Park
Prattsburgh Wind Park is a 55.5 MW onshore wind request withdrawn in the NYISO interconnection queue, in Yates County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2002 (completed)
- Withdrawn / abandonedMar 2010 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 113
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Windfarm Prattsburgh, LLC
- Connection point (POI)
- Eelpot Rd-Flat St. 115kV
- Location
- Yates County, New York
- Technology
- Wind: 55.5 MW
- Total requested
- 55.5 MW
- Queue status
- Withdrawn
- Entered queue
- 22 April 2002
- Withdrawn
- March 2010
Location
Marker shows the centre of Yates County; the queue data does not give exact sites.
Other requests in Yates County
- Greenidge Unit #4Gas · 106 MW · built
- Greenidge Unit #4Gas · 106 MW · built
- Wild Ox SolarSolar + storage · 132 MW · withdrawn
- Wild Ox SolarSolar + storage · 130 MW · withdrawn
- Budbreak Storage IBattery storage · 100 MW · withdrawn
- Budbreak Solar IISolar · 100 MW · withdrawn
- Budbreak Solar ISolar · 100 MW · withdrawn
- Budbreak Storage IIBattery storage · 100 MW · withdrawn
- Western Door WindOnshore wind · 100 MW · withdrawn
- Prattsburgh Wind FarmOnshore wind · 78.2 MW · withdrawn
- Barrington SolarSolar · 18.4 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem