United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Mulberry Energy Storage

Mulberry Energy Storage is a 130 MW battery storage request withdrawn in the NYISO interconnection queue, in Saratoga County, New York, connecting to NM-NG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1442
Grid region
NYISO (New York)
Utility / transmission owner
NM-NG
Developer
Mulberry Energy Storage 1, LLC
Connection point (POI)
Luther Forest - Eastover Road #308 115kV line
Location
Saratoga County, New York
Technology
Battery: 130 MW
Total requested
130 MW
Queue status
Withdrawn
Entered queue
28 September 2022

Location

Marker shows the centre of Saratoga County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Saratoga County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem