West River Solar

West River Solar is a 20.0 MW solar request withdrawn in the NYISO interconnection queue, in Saratoga County, New York, connecting to NM-NG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2021 (completed)
  2. Withdrawn / abandonedJun 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1165
Grid region
NYISO (New York)
Utility / transmission owner
NM-NG
Developer
West River Solar
Connection point (POI)
Battenkill to Mohican 115kV line#15
Location
Saratoga County, New York
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Queue status
Withdrawn
Entered queue
7 May 2021
Withdrawn
June 2023

Location

Marker shows the centre of Saratoga County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Saratoga County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem