United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISONYSD Energy Storage
NYSD Energy Storage is a 5.5 MW battery storage request withdrawn in the NYISO interconnection queue, in Saratoga County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2019 (completed)
- Withdrawn / abandonedMar 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 937
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Boralex US Development, LLC
- Connection point (POI)
- Mechanicville 34.5 kV
- Location
- Saratoga County, New York
- Technology
- Battery: 5.5 MW
- Total requested
- 5.5 MW
- Queue status
- Withdrawn
- Entered queue
- 4 November 2019
- Withdrawn
- March 2020
Location
Marker shows the centre of Saratoga County; the queue data does not give exact sites.
Other requests in Saratoga County
- Kce NY 1Battery storage · 20.0 MW · built
- ELP Stillwater SolarSolar · 20.0 MW · built
- Kce NY 1Battery storage · 20.0 MW · built
- ELP Stillwater SolarSolar · 20.0 MW · built
- Stewarts Bridge HydroHydro · 3.0 MW · built
- Stewarts Bridge HydroHydro · 3.0 MW · built
- WaterfordGas · 530 MW · withdrawn
- Mulberry Energy StorageBattery storage · 130 MW · withdrawn
- Mulberry Energy StorageBattery storage · 130 MW · withdrawn
- Kce NY 1Other · 20.0 MW · withdrawn
- West River SolarSolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem