United States βΊ Grid βΊ Interconnection queues βΊ New York
BATTERY STORAGE Β· NYISOKce NY 1
Kce NY 1 is a 20.0 MW battery storage request built and operating in the NYISO interconnection queue, connecting to NYSEG.
Request details
- Queue ID
- 701
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- KCE NY 1, LLC
- Connection point (POI)
- Luther Forest 34.5kV
- Location
- New York
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Study phase
- FES, SIS, FS
- Queue status
- Operational
- Entered queue
- 15 March 2018
Location
Marker shows the centre of County; the queue data does not give exact sites.
Other requests in County
- Kce NY 1Battery storage Β· 20.0 MW Β· built
- ELP Stillwater SolarSolar Β· 20.0 MW Β· built
- ELP Stillwater SolarSolar Β· 20.0 MW Β· built
- Stewarts Bridge HydroHydro Β· 3.0 MW Β· built
- Stewarts Bridge HydroHydro Β· 3.0 MW Β· built
- WaterfordGas Β· 530 MW Β· withdrawn
- Mulberry Energy StorageBattery storage Β· 130 MW Β· withdrawn
- Mulberry Energy StorageBattery storage Β· 130 MW Β· withdrawn
- Kce NY 1Other Β· 20.0 MW Β· withdrawn
- West River SolarSolar Β· 20.0 MW Β· withdrawn
- NYSD Energy StorageBattery storage Β· 5.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem