United States βΊ Grid βΊ Interconnection queues βΊ New York
GAS Β· NYISO130 MW Uprate
130 MW Uprate is a 130 MW gas request withdrawn in the NYISO interconnection queue, connecting to CONED.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2005 (completed)
- Withdrawn / abandonedMar 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 202
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CONED
- Developer
- Liberty Generating Co.
- Connection point (POI)
- Goethal 345kV
- Location
- New York
- Technology
- Gas: 130 MW
- Total requested
- 130 MW
- Queue status
- Withdrawn
- Entered queue
- 25 August 2005
- Withdrawn
- March 2019
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem