United States βΊ Grid βΊ Interconnection queues βΊ New York
OTHER Β· NYISOOrion Energy NY III
Orion Energy NY III is a 150 MW other request withdrawn in the NYISO interconnection queue, in Clinton County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2004 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 159
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Orion Energy, LLC
- Connection point (POI)
- TBD
- Location
- Clinton County, New York
- Technology
- Other: 150 MW
- Total requested
- 150 MW
- Queue status
- Withdrawn
- Entered queue
- 12 October 2004
Location
Marker shows the centre of Clinton County; the queue data does not give exact sites.
Other requests in Clinton County
- Bull Run II WindOnshore wind Β· 449 MW Β· in study
- Valcour StorageBattery storage Β· 150 MW Β· in study
- Leo Energy StorageBattery storage Β· 75.0 MW Β· in study
- Marble River II Wind FarmOnshore wind Β· 132 MW Β· built
- Marble River II Wind FarmOnshore wind Β· 132 MW Β· built
- Altona WindfieldOnshore wind Β· 99.0 MW Β· built
- Altona WindfieldOnshore wind Β· 99.0 MW Β· built
- Marble River Wind FarmOnshore wind Β· 83.0 MW Β· built
- Marble River Wind FarmOnshore wind Β· 83.0 MW Β· built
- Ellenburg WindfieldOnshore wind Β· 81.0 MW Β· built
- Ellenburg WindfieldOnshore wind Β· 81.0 MW Β· built
- Clinton WindfieldOnshore wind Β· 79.5 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem