United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Ramadi Utility

Ramadi Utility is a 140 MW battery storage request withdrawn in the NYISO interconnection queue, in Suffolk County, New York, connecting to LIPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1616
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
YSG Community Solar
Connection point (POI)
Sills Road 138kV Substation
Location
Suffolk County, New York
Technology
Battery: 140 MW
Total requested
140 MW
Queue status
Withdrawn
Entered queue
27 September 2023

Location

Marker shows the centre of Suffolk County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Suffolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem