United States › Grid › Interconnection queues › Pennsylvania
BATTERY STORAGE · NYISOMainesburg ESS
Mainesburg ESS is a 130 MW battery storage request withdrawn in the NYISO interconnection queue, in Tioga County, Pennsylvania, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1036
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Juno Power Management LLC
- Connection point (POI)
- Mainesburg - Watercure 345kV
- Location
- Tioga County, Pennsylvania
- Technology
- Battery: 130 MW
- Total requested
- 130 MW
- Queue status
- Withdrawn
- Entered queue
- 22 June 2020
Location
Marker shows the centre of Tioga County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Tioga County
- Solar project AH2-115, Tioga CountySolar · 85.0 MW · in study
- Blossburg Station Unit 1Gas · 2.5 MW · built
- Tioga County PowerGas · 550 MW · withdrawn
- Gas project D24, Tioga CountyGas · 500 MW · withdrawn
- Gas project AA2-120, Tioga CountyGas · 250 MW · withdrawn
- Onshore wind project Q33, Tioga CountyOnshore wind · 150 MW · withdrawn
- Battery storage project AF2-412, Tioga CountyBattery storage · 100 MW · withdrawn
- Cherry FlatsOnshore wind · 90.0 MW · withdrawn
- Onshore wind project R45, Tioga CountyOnshore wind · 70.0 MW · withdrawn
- Solar project AG2-433, Tioga CountySolar · 50.0 MW · withdrawn
- Solar project AH2-188, Tioga CountySolar · 35.0 MW · withdrawn
- Gas project AC2-077, Tioga CountyGas · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem