United States › Grid › Interconnection queues › Pennsylvania
GAS · PJMBlossburg Station Unit 1
Blossburg Station Unit 1 is a 2.5 MW gas request built and operating in the PJM interconnection queue, in Tioga County, Pennsylvania, connecting to PENELEC.
Request details
- Queue ID
- AF1-198
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Blossburg #1 CT 34.5 kV
- Location
- Tioga County, Pennsylvania
- Technology
- Gas: 2.5 MW
- Total requested
- 2.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 26 September 2019
- Proposed online date
- September 2023
- Came online
- July 2020
Location
Marker shows the centre of Tioga County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Tioga County
- Solar project AH2-115, Tioga CountySolar · 85.0 MW · in study
- Tioga County PowerGas · 550 MW · withdrawn
- Gas project D24, Tioga CountyGas · 500 MW · withdrawn
- Gas project AA2-120, Tioga CountyGas · 250 MW · withdrawn
- Onshore wind project Q33, Tioga CountyOnshore wind · 150 MW · withdrawn
- Mainesburg ESSBattery storage · 130 MW · withdrawn
- Battery storage project AF2-412, Tioga CountyBattery storage · 100 MW · withdrawn
- Cherry FlatsOnshore wind · 90.0 MW · withdrawn
- Onshore wind project R45, Tioga CountyOnshore wind · 70.0 MW · withdrawn
- Solar project AG2-433, Tioga CountySolar · 50.0 MW · withdrawn
- Solar project AH2-188, Tioga CountySolar · 35.0 MW · withdrawn
- Gas project AC2-077, Tioga CountyGas · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem