United States › Grid › Interconnection queues › Pennsylvania
SOLAR · PJMSolar project AH2-115, Tioga County
Solar project AH2-115, Tioga County is a 85.0 MW solar request in interconnection study in the PJM interconnection queue, in Tioga County, Pennsylvania, connecting to PENELEC.
- PlanningQueued Feb 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jan 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AH2-115
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Mansfield - Mainesburg 115 kV
- Location
- Tioga County, Pennsylvania
- Technology
- Solar: 85.0 MW
- Total requested
- 85.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 23 February 2022
- Proposed online date
- January 2026
Location
Marker shows the centre of Tioga County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Tioga County
- Blossburg Station Unit 1Gas · 2.5 MW · built
- Tioga County PowerGas · 550 MW · withdrawn
- Gas project D24, Tioga CountyGas · 500 MW · withdrawn
- Gas project AA2-120, Tioga CountyGas · 250 MW · withdrawn
- Onshore wind project Q33, Tioga CountyOnshore wind · 150 MW · withdrawn
- Mainesburg ESSBattery storage · 130 MW · withdrawn
- Battery storage project AF2-412, Tioga CountyBattery storage · 100 MW · withdrawn
- Cherry FlatsOnshore wind · 90.0 MW · withdrawn
- Onshore wind project R45, Tioga CountyOnshore wind · 70.0 MW · withdrawn
- Solar project AG2-433, Tioga CountySolar · 50.0 MW · withdrawn
- Solar project AH2-188, Tioga CountySolar · 35.0 MW · withdrawn
- Gas project AC2-077, Tioga CountyGas · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem