ONSHORE WIND Β· PJMOnshore wind project R45, Tioga County
Onshore wind project R45, Tioga County is a 70.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Tioga County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2006 (completed)
- Withdrawn / abandonedFeb 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R45
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Mansfield - Tower Hill 115kV
- Location
- Tioga County, Pennsylvania
- Technology
- Wind: 70.0 MW
- Total requested
- 70.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 4 December 2006
- Proposed online date
- April 2009
- Withdrawn
- February 2009
Location
Marker shows the centre of Tioga County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Tioga County
- Solar project AH2-115, Tioga CountySolar Β· 85.0 MW Β· in study
- Blossburg Station Unit 1Gas Β· 2.5 MW Β· built
- Tioga County PowerGas Β· 550 MW Β· withdrawn
- Gas project D24, Tioga CountyGas Β· 500 MW Β· withdrawn
- Gas project AA2-120, Tioga CountyGas Β· 250 MW Β· withdrawn
- Onshore wind project Q33, Tioga CountyOnshore wind Β· 150 MW Β· withdrawn
- Mainesburg ESSBattery storage Β· 130 MW Β· withdrawn
- Battery storage project AF2-412, Tioga CountyBattery storage Β· 100 MW Β· withdrawn
- Cherry FlatsOnshore wind Β· 90.0 MW Β· withdrawn
- Solar project AG2-433, Tioga CountySolar Β· 50.0 MW Β· withdrawn
- Solar project AH2-188, Tioga CountySolar Β· 35.0 MW Β· withdrawn
- Gas project AC2-077, Tioga CountyGas Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem