Completed queue projects in ERCOT (Texas) — page 11

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown61395.3 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

613 requests · page 11 of 13
ProjectCapacityStatusLocationRegionQueuedOnline
WKN Mozart
Onshore wind · WKN Mozart, LLC
30.0 MWOperating ERCOT Aug 20072012
Blue Summit Battery
Battery storage · Nextera
30.0 MWOperating ERCOT Feb 20162017
Q1 Valley Road DGR
Other · Life Cycle Power
29.0 MWOperating ERCOT Jun 20252025
Z5 Southton DGR
Other · Life Cycle Power
29.0 MWOperating ERCOT Jun 20252025
X1 Medina Base DGR
Other · Life Cycle Power
29.0 MWOperating ERCOT Jun 20252025
RE Maplewood 2b Solar
Solar · Recurrent Energy
28.0 MWOperating Pecos, TXERCOT Oct 20142021
Espiritu Wind
Onshore wind · Acciona
25.2 MWOperating Cameron, TXERCOT May 20152021
SP TX-12B BESS
Other · VESI Upton County BESS, LLC
25.1 MWOperating Upton, TXERCOT Jun 20192023
Greenville Engine Plant
Gas · GEUS
25.0 MWOperating ERCOT Oct 2008target 2010
Barilla Solar
Solar · First Solar
22.0 MWOperating ERCOT Dec 20102015
Bastrop Energy Center AGP repower Phase II
Gas
21.0 MWOperating Bastrop, TXERCOT Apr 20212022
Bastrop Energy Center AGP repower Phase I
Gas
21.0 MWOperating Bastrop, TXERCOT Apr 20212022
Big Brown 2 Upgrade
Coal · TXU Big Brown Company
20.0 MWOperating ERCOT Aug 2007
Big Brown 1 Upgrade
Coal · TXU Big Brown Company, LP
20.0 MWOperating ERCOT Apr 2007
Pyron Wind Repower
Onshore wind
19.9 MWOperating Nolan, TXERCOT Aug 20222024
Anchor Wind IV
Onshore wind
19.3 MWOperating Eastland, TXERCOT Dec 20212024
Rio Nogales Agp Upgrade CT1
Gas · CPS Energy
19.0 MWOperating Guadalupe, TXERCOT Feb 20192019
Rio Nogales Agp Upgrade CT3
Gas · CPS Energy
19.0 MWOperating Guadalupe, TXERCOT May 20192020
Martin Lake Unit 1 Expansion
Coal · Luminant
18.0 MWOperating ERCOT Oct 2008
Cameron Storage
Other · Cameron Wind 1, LLC
18.0 MWOperating Cameron, TXERCOT Sep 20202024
W A Parish 7 Uprate
Coal · Texas Genco
17.0 MWOperating ERCOT Jan 2006
Oxy Solar
Solar · Oxy Renewable Energy
16.2 MWOperating Ector, TXERCOT Jul 20182021
Big Spring Electricity Generating Facility
Gas · Sid Richardson Carbon
16.0 MWOperating ERCOT Dec 2003target 2006
Rentech Project
Gas · Agrifos Fertilizer, Inc
16.0 MWOperating ERCOT Jun 20112014
Panther Creek III Repower
Onshore wind
16.0 MWOperating Howard, TXERCOT Nov 20192022
WA Parish Upgrade
Coal · NRG Texas Power
15.0 MWOperating ERCOT Oct 2009
Martin Lake Unit 2 Expansion
Coal · Luminant
13.0 MWOperating ERCOT Oct 2008
STP Unit 1 repower
Nuclear
13.0 MWOperating Matagorda, TXERCOT Jul 20192021
Inertia BESS
Other · Inertia Energy Storage, LLC
13.0 MWOperating Haskell, TXERCOT Jun 20202024
RIO NOGALES UPGRADE CT2 repower
Gas
13.0 MWOperating Guadalupe, TXERCOT May 20192021
Nasa
Gas · NASA
12.0 MWOperating Harris, TXERCOT Mar 20152022
Bobcat Bluff repower
Onshore wind
12.0 MWOperating Archer, TXERCOT May 20182020
LEVEE (Freeport LNG)
Gas · Freeport LNG
11.0 MWOperating Brazoria, TXERCOT Dec 20112019
Lonestar BESS
Other
10.0 MWOperating Ward, TXERCOT 2022
Gomez BESS
Other
10.0 MWOperating Pecos, TXERCOT 2023
Goodwin BESS
Battery storage
10.0 MWOperating Hidalgo, TXERCOT 2025
Pauline BESS
Other · HEN INFRASTRUCTURE LLC 1
10.0 MWOperating Henderson, TXERCOT Jun 20232024
Mustang Bayou BESS
Battery storage
10.0 MWOperating Brazoria, TXERCOT 2025
BRP Pueblo II BESS
Other
10.0 MWOperating Maverick, TXERCOT 2022
North Mercedes BESS
Other
10.0 MWOperating Hidalgo, TXERCOT 2023
Diboll Bess
Other
10.0 MWOperating Angelina, TXERCOT 2024
North Alamo BESS
Other
10.0 MWOperating Hidalgo, TXERCOT 2023
Holcomb BESS (Burro BESS)
Other
10.0 MWOperating La Salle, TXERCOT 2023
Val Verde BESS
Other
10.0 MWOperating Hidalgo, TXERCOT 2024
Garden City East BESS
Other · HEN Infrastructure, LLC 2
10.0 MWOperating Glasscock, TXERCOT Jan 20232024
Lufkin South BESS
Other · HEN INFRASTRUCTURE LLC 1
10.0 MWOperating Angelina, TXERCOT Jun 20232024
Rodeo Ranch Energy Storage Repowering
Battery storage
10.0 MWOperating Reeves, TXERCOT Aug 20232025
BRP Pueblo I BESS
Other
10.0 MWOperating Maverick, TXERCOT 2022
West Harlingen BESS
Other
10.0 MWOperating Cameron, TXERCOT 2023
Elsa BESS
Other
10.0 MWOperating Hidalgo, TXERCOT 2023
Page 11 of 13

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)