United States β€Ί Grid β€Ί Interconnection queues

OTHER Β· ERCOT

Z5 Southton DGR

Z5 Southton DGR is a 29.0 MW other request built and operating in the ERCOT interconnection queue.

Queue statusOperating
  1. PlanningQueued Jun 2025 (completed)
  2. ConsentedJul 2025 (completed)
  3. Construction (completed)
  4. OperatingSep 2025 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
26INR0684
Grid region
ERCOT (Texas)
Developer
Life Cycle Power
Connection point (POI)
XFMR #3
Technology
Other: 29.0 MW
Total requested
29.0 MW
Study phase
IA
Queue status
Operational
Entered queue
6 June 2025
Agreement signed
31 July 2025
Proposed online date
September 2025
Came online
September 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem