East Appleton is a 4.98 MW solar farm in Yorkshire and the Humber, England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Yorkshire and the Humber
- England
Key facts
- Installed capacity
- 4.98 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- Yorkshire and the Humber
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- DL10 7QE
- Coordinates
- 54.3569, -1.6374
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How East Appleton compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.98 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Yorkshire and the Humber All run by AnescoNearby generating sites
- Stripe Β· 4.98 MW solar farm7.8 km
- Ainderby Β· 4.96 MW solar farm10.4 km
- Hunger Hill Β· 5 MW solar farm19.4 km
- Sandhutton Β· 5 MW solar farm20.4 km
- Moor House Wind Farm Β· 12 MW onshore wind farm25.9 km
- School Aycliffe Β· 5 MW solar farm28.0 km
- Seamer Β· 10.3 MW onshore wind farm28.9 km
- Lambs Hill Wind Farm Β· 8 MW onshore wind farm29.1 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Land East of Appleton Farm
- Developer / operator
- Gresham House
- Planning authority
- North Yorkshire
- Planning reference
- 15/00448/FULL
- Application submitted
- 16 June 2015
- Permission granted
- 14 September 2015
- Construction started
- 15 January 2016
- Began operating
- 27 March 2016
- Capacity in planning record
- 5 MW
- Address
- Ld N Of East Appleton Hall Far, East Appleton, Richmond, North Yorkshire, North Yorkshire, DL10 7QE
- REPD reference
- 5400
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.