Sandhutton
Sandhutton is a 5 MW solar farm in Yorkshire and the Humber, England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Yorkshire and the Humber
- England
Key facts
- Installed capacity
- 5 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- Yorkshire and the Humber
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- YO7 4RW
- Coordinates
- 54.2370, -1.3985
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Sandhutton compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Yorkshire and the Humber All run by Greencoat CapitalNearby generating sites
- Cold Harbour Β· 5 MW solar farm9.2 km
- Ainderby Β· 4.96 MW solar farm11.2 km
- Peter Hill Β· 5 MW solar farm14.2 km
- East Appleton Β· 4.98 MW solar farm20.4 km
- Stripe Β· 4.98 MW solar farm28.0 km
- Mill Hill Farm Β· 5 MW solar farm28.6 km
- Seamer Β· 10.3 MW onshore wind farm30.0 km
- Hunger Hill Β· 5 MW solar farm30.5 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Land North of Sandhutton Lane
- Developer / operator
- Greencoat Capital
- Planning authority
- North Yorkshire
- Planning reference
- 15/01074/FUL
- Application submitted
- 25 May 2015
- Permission granted
- 25 September 2015
- Construction started
- 12 December 2016
- Began operating
- 15 February 2017
- Capacity in planning record
- 5 MW
- Address
- Land North Of, Sandhutton Lane, Carlton Miniott, Thirsk, North Yorkshire, YO7 4NH
- REPD reference
- 5297
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.