Peter Hill
Peter Hill is a 5 MW solar farm in Yorkshire and the Humber, England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Yorkshire and the Humber
- England
Key facts
- Installed capacity
- 5 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Octopus Investments
- Region
- Yorkshire and the Humber
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- YO61 4PN
- Coordinates
- 54.1520, -1.2354
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Peter Hill compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Yorkshire and the Humber All run by Octopus InvestmentsNearby generating sites
- Cold Harbour Β· 5 MW solar farm5.6 km
- Sandhutton Β· 5 MW solar farm14.2 km
- Mill Hill Farm Β· 5 MW solar farm14.6 km
- Ainderby Β· 4.96 MW solar farm25.2 km
- Knabs Ridge Β· 16 MW onshore wind farm31.9 km
- East Appleton Β· 4.98 MW solar farm34.7 km
- Hook Moor Wind Farm Β· 10 MW onshore wind farm37.4 km
- Seamer Β· 10.3 MW onshore wind farm38.1 km
Also operated by Octopus Investments
Octopus Investments operates 134 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Land South of Highfield House
- Developer / operator
- Lightsource Renewable Energy
- Planning authority
- North Yorkshire
- Planning reference
- 15/00318/FUL
- Application submitted
- 20 February 2015
- Permission granted
- 29 June 2015
- Construction started
- 14 January 2016
- Began operating
- 15 March 2016
- Capacity in planning record
- 5 MW
- Address
- Land South East Of Highfield House, Husthwaite, York, North Yorkshire, North Yorkshire, YO61 4PN
- REPD reference
- 5033
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.