SOLAR Β· OPERATIONAL

Bulls Head North

Bulls Head North is a 5.51 MW solar farm in South East England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South East
  • England
Project stageOperating
  1. PlanningDec 2013 (completed)
  2. ConsentedApr 2014 (completed)
  3. ConstructionJul 2014 (completed)
  4. OperatingOct 2014 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5.51 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
MK16 8LP
Coordinates
52.1542, -0.8107

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bulls Head North compares

236th of 662largest solar farms in the UK register
46th of 105in South East
0.10%of listed UK solar farms capacity
β‰ˆ 4.8 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5.51 MW station would generate roughly 4.8 GWh of electricity in a year, similar to the annual use of about 1,790 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Bulls Head Farm North
Developer / operator
Anesco
Planning authority
West Northamptonshire
Planning reference
S/2013/1642/MAF
Application submitted
12 December 2013
Permission granted
1 April 2014
Construction started
1 July 2014
Began operating
2 October 2014
Capacity in planning record
4.7 MW
Address
Bulls Head Farm, Eakley Lanes, Stoke Goldington, Newport Pagnell, Buckinghamshire, Northamptonshire, MK16 8LP
REPD reference
1976

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.