Salcey Farm
Salcey Farm is a 5.46 MW solar farm in South East England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South East
- England
Key facts
- Installed capacity
- 5.46 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- MK16 8LP
- Coordinates
- 52.1466, -0.7565
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Salcey Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5.46 MW station would generate roughly 4.8 GWh of electricity in a year, similar to the annual use of about 1,770 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South East All run by AnescoNearby generating sites
- Bulls Head North Β· 5.51 MW solar farm3.8 km
- Littlewood Β· 5 MW solar farm4.6 km
- Littlewood Β· 13.7 MW solar farm4.6 km
- Hyde Farm Β· 4.94 MW solar farm4.9 km
- Milton Keynes Β· 14 MW onshore wind farm5.0 km
- UK Solar (Hartwell) LLP Β· 18.6 MW solar farm6.8 km
- Roade Β· 7.2 MW onshore wind farm7.4 km
- Blisworth Solar Farm Β· 3.59 MW solar farm12.2 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Salcey Solar Farm
- Developer / operator
- NextEnergy Capital
- Planning authority
- Milton Keynes
- Planning reference
- 13/02504/FUL
- Application submitted
- 2 December 2013
- Permission granted
- 7 March 2014
- Construction started
- 1 June 2014
- Began operating
- 25 September 2014
- Capacity in planning record
- 5 MW
- Address
- Bulls Head Farm, Eakley Lanes, Stoke Goldington, Newport Pagnell, Buckinghamshire, Buckinghamshire, MK16 8LP
- REPD reference
- 1878
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.