Blisworth Solar Farm

Blisworth Solar Farm is a 3.59 MW solar farm in East Midlands England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningJun 2015 (completed)
  2. ConsentedApr 2016 (completed)
  3. ConstructionJul 2016 (completed)
  4. OperatingOct 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
3.59 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
NN7 3DA
Coordinates
52.1672, -0.9324

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Blisworth Solar Farm compares

554th of 662largest solar farms in the UK register
80th of 95in East Midlands
0.06%of listed UK solar farms capacity
β‰ˆ 3.1 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3.59 MW station would generate roughly 3.1 GWh of electricity in a year, similar to the annual use of about 1,160 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Land South of Knock Lane
Developer / operator
Solar Power Inc UK Services/SPI China (HK)
Planning authority
West Northamptonshire
Planning reference
S/2015/1233/MAF
Application submitted
5 June 2015
Permission granted
21 April 2016
Construction started
1 July 2016
Began operating
1 October 2016
Capacity in planning record
4 MW
Address
Land To The South of, Knock Lane, Blisworth, Northampton,, Northamptonshire, NN7 3DA
REPD reference
5282

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source