SOLAR Β· OPERATIONAL

Homestead

Homestead is a 17.7 MW solar farm in East Midlands England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningSep 2014 (completed)
  2. ConsentedDec 2014 (completed)
  3. ConstructionJan 2015 (completed)
  4. OperatingMar 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
17.7 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
NN12 7LS
Coordinates
52.0962, -0.9235

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Homestead compares

70th of 662largest solar farms in the UK register
14th of 95in East Midlands
0.31%of listed UK solar farms capacity
β‰ˆ 16 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 17.7 MW station would generate roughly 16 GWh of electricity in a year, similar to the annual use of about 5,750 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Homestead Farm (Alderton)
Developer / operator
CEE
Planning authority
West Northamptonshire
Planning reference
S/2014/1680/MAF
Application submitted
11 September 2014
Permission granted
11 December 2014
Construction started
1 January 2015
Began operating
30 March 2015
Capacity in planning record
17.6 MW
Address
Land at Homestead Farm located east of the A5 and south of Alderton, (Paulerspury & Grafton Regis & Alderton Parish), Northamptonshire
REPD reference
2261

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.